WEMO ERT Set 2 Photographs: March 2011

A collection of photographs taken by the Wellington Emergency Management Office (WEMO) Emergency Response Team in March 2011. The photographs are part of set two of WEMO's USAR photographs.

Last updated
8:04pm 1st November 2017
Type
Collection
Identifier
qsr-collection:20079

Contains 180 items


WEMO ERT Set 1 - March 2011 - Photograph 61
WEMO ERT Set 1 - March 2011 - Photograph 61
A photograph of emergency management personnel standing in front of the Craig's Investment Partners House on Armagh Street. The Victoria Apartments to the left are on a noticeable forward lean.
WEMO ERT Set 1 - March 2011 - Photograph 62
WEMO ERT Set 1 - March 2011 - Photograph 62
A photograph of the Craig's Investment Partners House and the Victoria Apartments on Armagh Street. Several emergency management personnel are walking along the street below.
WEMO ERT Set 1 - March 2011 - Photograph 63
WEMO ERT Set 1 - March 2011 - Photograph 63
A photograph of rubble in a car park behind the Forsyth Barr building. The rubble is mostly made up of concrete staircases with messages spray-painted on the sides.
WEMO ERT Set 1 - March 2011 - Photograph 64
WEMO ERT Set 1 - March 2011 - Photograph 64
A photograph of rubble in a car park behind the Forsyth Barr building. The rubble is mostly made up of concrete staircases. Two emergency management personnel are standing in the foreground.
WEMO ERT Set 1 - March 2011 - Photograph 65
WEMO ERT Set 1 - March 2011 - Photograph 65
A photograph of emergency management personnel standing in a car park behind the Forsyth Barr building. In the background rubble from an earthquake-damaged building has been stacked in a pile. The rubble is mostly made up of concrete staircases.
WEMO ERT Set 1 - March 2011 - Photograph 66
WEMO ERT Set 1 - March 2011 - Photograph 66
A photograph of emergency management personnel standing in a car park behind the Forsyth Barr building. In the background rubble from an earthquake-damaged building has been stacked in a pile. The rubble is mostly made up of concrete staircases.
WEMO ERT Set 1 - March 2011 - Photograph 67
WEMO ERT Set 1 - March 2011 - Photograph 67
A photograph of rubble in a car park behind the Forsyth Barr building. The rubble is mostly made up of concrete staircases. An emergency management team member is standing to the right.
WEMO ERT Set 1 - March 2011 - Photograph 68
WEMO ERT Set 1 - March 2011 - Photograph 68
A photograph of signs under the rear section of the Forsyth Barr building. The signs reads, "Danger drop zone". In the background is rubble from an earthquake-damaged building . Steel bracing has been constructed around a concrete pillar to the right.
WEMO ERT Set 1 - March 2011 - Photograph 69
WEMO ERT Set 1 - March 2011 - Photograph 69
A photograph of emergency management personnel examining a building on New Regent Street. Pavers on either side of the tramline have risen and shifted out of place. Many tables and chairs from cafes and restaurants are still sitting outside.
WEMO ERT Set 1 - March 2011 - Photograph 70
WEMO ERT Set 1 - March 2011 - Photograph 70
A photograph of emergency management personnel walking down New Regent Street towards the intersection of Armagh Street. Pavers along either side of the tramline have risen and shifted out of place. Many tables and chairs from cafes and restaurants are still sitting outside.
WEMO ERT Set 1 - March 2011 - Photograph 71
WEMO ERT Set 1 - March 2011 - Photograph 71
A photograph of the earthquake damage to the Iconic Bar and the former Christchurch City Council offices on Manchester Street. The outer walls of the Council offices and the top storey of Iconic have collapsed, exposing the insides of the buildings. The bricks and other rubble have been cleared from the footpath in front. USAR codes have been spray-painted next to the entrance of Iconic.
WEMO ERT Set 1 - March 2011 - Photograph 72
WEMO ERT Set 1 - March 2011 - Photograph 72
A photograph of a member of an emergency management team standing on Gloucester Street near Latimer Square. In the background an excavator is clearing the rubble from a demolished building.