Photographs of Gap Filler project 22

Photographs of Gap Filler's twenty-second project, the Pallet Pavilion.

Last updated
9:24am 3rd November 2017
Type
Collection
Identifier
qsr-collection:13117

Contains 135 items


Photograph of Gap Filler project 22 (1)
Photograph of Gap Filler project 22 (1)
The site of the demolished Crowne Plaza Hotel on the corner of Durham and Kilmore Streets. The construction of the Pallet Pavilion is underway.
Photograph of Gap Filler project 22 (2)
Photograph of Gap Filler project 22 (2)
Volunteers drilling holes in pallets during the construction of the Pallet Pavilion.
Photograph of Gap Filler project 22 (3)
Photograph of Gap Filler project 22 (3)
A woman performing on the stage at the Pallet Pavilion.
Photograph of Gap Filler project 22 (4)
Photograph of Gap Filler project 22 (4)
The partially demolished Crown Plaza Hotel on the corner of Durham and Kilmore Streets. A crowd of people can be seen out front, watching a long-reach excavator demolishing the building.
Photograph of Gap Filler project 22 (5)
Photograph of Gap Filler project 22 (5)
A rainbow over the Pallet Pavilion.
Photograph of Gap Filler project 22 (6)
Photograph of Gap Filler project 22 (6)
Concrete slabs laid on the ground of the Crowne Plaza Hotel's demolition site. This will serve as the floor of the Pallet Pavilion.
Photograph of Gap Filler project 22 (7)
Photograph of Gap Filler project 22 (7)
Volunteers in hard hats and high-visibility vests helping to build the Pallet Pavilion.
Photograph of Gap Filler project 22 (8)
Photograph of Gap Filler project 22 (8)
Two men and a crane laying slabs of concrete on the site of the Pallet Pavilion. These will serve as a floor for the structure.
Photograph of Gap Filler project 22 (9)
Photograph of Gap Filler project 22 (9)
Two men and a crane laying slabs of concrete on the site of the Pallet Pavilion. These will serve as a floor for the structure.
Photograph of Gap Filler project 22 (10)
Photograph of Gap Filler project 22 (10)
Two men and a crane laying slabs of concrete on the site of the Pallet Pavilion. These will serve as a floor for the structure.
Photograph of Gap Filler project 22 (11)
Photograph of Gap Filler project 22 (11)
Two men and a crane laying slabs of concrete on the site of the Pallet Pavilion. These will serve as a floor for the structure.
Photograph of Gap Filler project 22 (12)
Photograph of Gap Filler project 22 (12)
The partially constructed Pallet Pavilion on the site of the demolished Crowne Plaza Hotel. Concrete slabs have been laid on the ground and a stack of painted pallets can be seen in the background.