A photograph of a member of the Diabetes Centre team sitting in an office. A section of the panelling has been removed from the wall in the background, exposing the insulation underneath.
A photograph of members of the Diabetes Centre team working in an office. New gib board has been partly installed on the wall behind them. There is dust from the construction on the carpet.
A photograph of members of the Diabetes Centre team working in an office. New gib board has been partly installed on the wall behind them. There is dust from the construction on the carpet.
A photograph of a room in the Diabetes Centre. The panelling has been removed from the walls, exposing the wooden framing, insulation, and wires underneath. Several drawer units have been stacked in the middle of the room.
A photograph of a room in the Diabetes Centre. The furniture in the centre of the room has been covered with a tarpaulin. In the background, the panelling has been removed from one of the walls, exposing the wooden frame, wires, and pipes underneath.
A photograph of a room in the Diabetes Centre where the furniture has been covered in plastic sheeting. The panelling has been removed from the wall behind, exposing the wooden framing and pink batts.
A photograph of several panels hanging from the ceiling of the Diabetes Centre. The panelling has been taken off the wall to the right, exposing the wooden structure beneath.
A photograph of a room in the Diabetes Centre. The panelling has been removed from the walls, exposing the wooden framing, insulation, and wires underneath. Tarpaulins have been draped over the furniture.
A photograph of a kitchen in the Diabetes Centre. The panelling has been removed from the wall of the kitchen, exposing the wooden frame and several pipes and wires.