- RedZoneApp (x)
- Becker Fraser Earthquake Photographs October 2010 (x)
- Search results
Search results
Islandora sort
Showing 1 - 20 of 32 results.
- dc.title
- BeckerFraserPhotos October 2010 photograph 010
- dc.description
- A machine pumping sewage into the Avon River on Avonside Drive.
- Date
- 3:22am 2nd October 2010
- Tags
- RedZoneApp, Avonside Drive, river, sewage, Avonside
- dc.title
- BeckerFraserPhotos October 2010 photograph 011
- dc.description
- Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
- Date
- 3:23am 2nd October 2010
- Tags
- RedZoneApp, Avonside Drive, contractor, sewage, Avonside
- dc.title
- BeckerFraserPhotos October 2010 photograph 012
- dc.description
- Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
- Date
- 3:24am 2nd October 2010
- Tags
- RedZoneApp, Avonside Drive, sewage, Avonside
- dc.title
- BeckerFraserPhotos October 2010 photograph 013
- dc.description
- Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
- Date
- 3:25am 2nd October 2010
- Tags
- RedZoneApp, Avonside Drive, digger, sewage, Avonside
- dc.title
- BeckerFraserPhotos October 2010 photograph 014
- dc.description
- The fixing of storm water drains on River Road in Avonside.
- Date
- 3:28am 2nd October 2010
- Tags
- RedZoneApp, contractor, digger, sewage, Avonside
- dc.title
- BeckerFraserPhotos October 2010 photograph 015
- dc.description
- One of many notices along Christchurch waterways, reading "Polluted water, please avoid contact, Christchurch City Council".
- Date
- 3:29am 2nd October 2010
- Tags
- RedZoneApp, water, river, signs
- dc.title
- BeckerFraserPhotos October 2010 photograph 016
- dc.description
- Underground infrastructure being repaired on Avonside Drive.
- Date
- 3:39am 2nd October 2010
- Tags
- RedZoneApp, river, Avonside, digger
- dc.title
- BeckerFraserPhotos October 2010 photograph 017
- dc.description
- A crack next to the Avon River caused by the ground slumping after the 4 September earthquake. A blue pipe has been laid over the crack. Many kilometres of these temporary water pipes have been run overground in Avonside to supply houses with water.
- Date
- 3:51am 2nd October 2010
- Tags
- RedZoneApp, river, water, Halswell, cracks
- dc.title
- BeckerFraserPhotos October 2010 photograph 039
- dc.description
- A slumped drain in Avonside with a road cone on top to warn road users.
- Date
- 1:48am 9th October 2010
- Tags
- RedZoneApp, liquefaction
- dc.title
- BeckerFraserPhotos October 2010 photograph 040
- dc.description
- Road seal along a street in Avonside which has been lifted by the earthquake.
- Date
- 1:49am 9th October 2010
- Tags
- RedZoneApp
- dc.title
- BeckerFraserPhotos October 2010 photograph 041
- dc.description
- A pile of gravel in Avonside used to fill up the gaps created by seismic activity and liquefaction. The cracks in this curb side have not been filled yet.
- Date
- 1:54am 9th October 2010
- Tags
- RedZoneApp
- dc.title
- BeckerFraserPhotos October 2010 photograph 042
- dc.description
- A photograph of road damage in Queensbury Street. The photographer says, "Many of the road disturbances are along the curb side requiring fill to level them".
- Date
- 1:57am 9th October 2010
- Tags
- Queensbury Street, RedZoneApp, Horseshoe Lake
- dc.title
- BeckerFraserPhotos October 2010 photograph 043
- dc.description
- A photograph of portable toilets in Burwood. Many hundreds of portable toilets have been provided to members of the public in areas where the sewerage system has failed and will require many months of major earthworks to rectify.
- Date
- 1:58am 9th October 2010
- Tags
- RedZoneApp, portable toilet
- dc.title
- BeckerFraserPhotos October 2010 photograph 044
- dc.description
- Contractors work to complete the relay of a sewerage line in Burwood.
- Date
- 1:58am 9th October 2010
- Tags
- contractor, cones, RedZoneApp, Burwood, Zena Place, Horseshoe Lake
- dc.title
- BeckerFraserPhotos October 2010 photograph 046
- dc.description
- Three men digging silt out of storm water drains in Burwood.
- Date
- 2:05am 9th October 2010
- Tags
- digger, drainage, water, contractor, RedZoneApp, Tasman Place, Burwood, Horseshoe Lake
- dc.title
- BeckerFraserPhotos October 2010 photograph 048
- dc.description
- The north end of the bridge on Gayhurst Road. During the earthquake, the bridge was forced about 15 centimetres towards the river, the land falling away under the road. Fencing has been placed around the footpath, and the road filled and resealed so that it can still be used by traffic.
- Date
- 3:49am 9th October 2010
- Tags
- RedZoneApp, earth movement, Gayhurst Road, bridge, bridge
- dc.title
- BeckerFraserPhotos October 2010 photograph 052
- dc.description
- The north end of the Gayhurst Road bridge with buckled railings and torn up footpath now filled in.
- Date
- 3:50am 9th October 2010
- Tags
- RedZoneApp
- dc.title
- BeckerFraserPhotos October 2010 photograph 051
- dc.description
- The north end of the Gayhurst Road bridge, pulling away from the stone walls on the bank.
- Date
- 3:50am 9th October 2010
- Tags
- RedZoneApp
- dc.title
- BeckerFraserPhotos October 2010 photograph 049
- dc.description
- A cracked and slumped containing wall that is ready to collapse.
- Date
- 3:50am 9th October 2010
- Tags
- RedZoneApp
- dc.title
- BeckerFraserPhotos October 2010 photograph 050
- dc.description
- The north end of the Gayhurst Road bridge, cracked down the side, the posts bent inwards and the road buckled. Tape has been woven across the bridge.
- Date
- 3:50am 9th October 2010
- Tags
- RedZoneApp, Gayhurst Road, bridge