A dock by the riverbank walkway alongside New Brighton Road which has been closed off to the public. The area has flooded at high tide due to ground subsidence".
Severe damage on a New Brighton Road. It had to be reformed and raised up 40 cm. A pile of dried liquefaction has been shovelled onto the footpath. Road cones mark out the uneven surfaces on the road.
Sandbags placed along the river bank to prevent flooding onto the road. The earthquake caused the ground in this area to subside , making it susceptible to flooding.