Search results
Islandora sort
Showing 121 - 140 of 511 results.
- dc.title
- WEMO ERT Set 1 - February 2011 - Photograph 57
- dc.description
- A photograph of construction workers and members of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Durham Street.
- Date
- 12:20pm 28th February 2011
- Tags
- construction worker, WEMO, Wellington Emergency Management Office, Emergency Response Team, ERT, Gloucester Street, Government and Politics
- dc.title
- Photograph of Gap Filler project 13 (52)
- dc.description
- The finished 10 square metre office building, now Gap Filler Headquarters in Sydenham. An information sign can be seen out front.
- Tags
- Gap Filler, 10 square metre office bulding, Gap Filler Headquarters, SHAC, Community
- dc.title
- Photograph of Gap Filler project 13 (11)
- dc.description
- A workspace inside Gap Filler Headquarters in Sydenham.
- Tags
- Gap Filler, 10 square metre office bulding, Gap Filler Headquarters, SHAC, Community
- dc.title
- An Epic Tour Photograph 1
- dc.description
- A photograph of a presentation about the EPIC centre during a tour of the building. The tour was conducted as part of FESTA 2012.
- Creator(s)
- Jessica Halliday
- Date
- 6:10am 25th October 2012
- Tags
- EPIC, innovation, collaboration, office, IT, business, temporary, FESTA
- dc.title
- WEMO ERT Set 1 - February 2011 - Photograph 12
- dc.description
- A photograph of members of the Wellington Emergency Management Office Emergency Response Team inside a workshop in Christchurch.
- Date
- 2:22pm 27th February 2011
- Tags
- Wellington Emergency Management Office, WEMO, workshop, Government and Politics
- dc.title
- WEMO ERT Set 1 - February 2011 - Photograph 62
- dc.description
- A photograph looking east down Gloucester Street from near the Manchester Street intersection. Members of the Wellington Emergency Management Office Emergency Response Team and construction workers are walking down the street. To their right is the new Press House building with many broken windows. In the foreground, the Coachman building has sustained earthquake damage to the façade. Wire fences have been placed around the building as a cordon.
- Date
- 12:25pm 28th February 2011
- Tags
- Gloucester Street, Manchester Street, Press House, Coachman Inn, façade, cordon fence, WEMO, Wellington Emergency Management Office, Emergency Response Team, ERT, Government and Politics
- dc.title
- Julia Holden's 2013 Photographs 276
- dc.description
- A photograph looking east down Tuam Street. The old Post Office building (now C1 Espresso) can be seen in the distance.
- Creator(s)
- Julia Holden
- Date
- 3:19am 20th October 2013
- Tags
- Tuam Street, Post Office, C1 Espresso
- dc.title
- Photograph of Gap Filler project 13 (40)
- dc.description
- Volunteers nail corrugated iron to the outside of the 10 square metre office building, soon to be Gap Filler Headquarters.
- Tags
- Gap Filler, 10 square metre office bulding, Gap Filler Headquarters, SHAC, Community
- dc.title
- BeckerFraserPhotos June 2012 photograph 026
- dc.description
- Photograph captioned by BeckerFraserPhotos, "The new Press building on Gloucester Street at dusk. The central city red zone now has office workers and lights on".
- Date
- 5:04am 4th June 2012
- Tags
- Gloucester Street, lights on, new Press building, office workers
- dc.title
- WEMO ERT Set 2 - February 2011 - Photograph 01
- dc.description
- A photograph of volunteers from the Wellington Emergency Management Office preparing for their journey to Christchurch after the 22 February 2011 earthquake. In the background is the Wellington Emergency Management Office building.
- Date
- 1:35am 27th February 2011
- Tags
- Wellington Emergency Management Office, Thorndon, Turnbull Street, Wellington, WEMO, Government and Politics
- dc.title
- WEMO ERT Set 1 - March 2011 - Photograph 34
- dc.description
- A photograph of the Wellington Emergency Management Office Emergency Response Team standing in a car park on Lichfield Street. The team are wearing face and gas masks, hard hats, safety glasses, knee pads, and rubber gloves. In the background are several earthquake-damaged buildings.
- Date
- 4:33pm 2nd March 2011
- Tags
- WEMO, Wellington Emergency Management Office, ERT, Emergency Response Team, car park, face mask, gas mask, safety glasses, knee pad, rubber glove, Government and Politics
- dc.title
- The Not So Grand Entrance to the Grand Plaza in Christchurch
- dc.description
- A view through a gap in the partially-demolished Crowne Plaza Hotel to the Forsyth Barr building.
- Creator(s)
- Steven Taylor
- Date
- 10:42pm 7th April 2012
- Tags
- Kilmore Street, Durham Street, metal, destruction, demolition, Crowne Plaza, concrete, office block, silhouette, broken, Red Zone, damaged, CBD, hotel, quake art, art
- dc.title
- BeckerFraserPhotos February 2012 photograph 0701
- dc.description
- A photograph captioned by BeckerFraserPhotos, "The temporary InterCity bus deport on Bealey Avenue".
- Date
- 3:37am 9th February 2012
- Tags
- Bealey Avenue, InterCity bus terminal, office in a container, Portacom
- dc.title
- Ray Whelan WEMO Photograph 27
- dc.description
- A photograph of volunteers from the Wellington Emergency Management Office at the canteen set up as part of a temporary Civil Defence headquarters after the 4 September 2010 earthquake. The headquarters was set up at the Mainland Foundation Ballpark on Pages Road.
- Creator(s)
- Ray Whelan
- Date
- 11:28pm 14th September 2010
- Tags
- Civil Defence, emergency management, Mainland Foundation Ballpark, Pages Road, WEMO, Wellington Emergency Management Office, Government and Politics
- dc.title
- WEMO ERT Set 3 - February 2011 - Photograph 078
- dc.description
- A photograph of a member of the Wellington Emergency Management Office Emergency Response Team using a crowbar to open the door of a building in the Christchurch central city.
- Date
- 6:45am 28th February 2011
- Tags
- WEMO, Wellington Emergency Management Office, crowbar, Government and Politics
- dc.title
- Julia Holden's 2012 Photographs 029
- dc.description
- A photograph of an empty site and badly-damaged buildings, taken from behind a fence on Madras Street. In the distance is the old Post Office building.
- Creator(s)
- Julia Holden
- Date
- 12:08pm 16th October 2012
- Tags
- Madras Street, CBD, Post Office, demolition
- dc.title
- BeckerFraserPhotos March 2013 photograph 072
- dc.description
- An aerial photograph looking west over Cathedral Square with the Christchurch Cathedral in the centre.
- Date
- 12:13am 6th March 2013
- Tags
- Cathedral Square, aerial, Heritage Apartment Hotel, Millenium Hotel, Old Post Office, Rydges Hotel
- dc.title
- Photograph of Gap Filler project 13 (34)
- dc.description
- Two women painting the base of a mural onto a wall in Sydenham.
- Tags
- Gap Filler, 10 square metre office bulding, Gap Filler Headquarters, SHAC, Community
- dc.title
- Photograph of Gap Filler project 13 (27)
- dc.description
- The structure of the 10 square metre office building which is to serve as Gap Filler Headquarters is almost complete. A sign on the front reads, "Gap Filler project in progress on this site".
- Tags
- Gap Filler, 10 square metre office bulding, Gap Filler Headquarters, SHAC, Community
- dc.title
- Photograph of Gap Filler project 13 (42)
- dc.description
- A volunteer sketching the words of a mural onto the wall of a building in Sydenham.
- Tags
- Gap Filler, 10 square metre office bulding, Gap Filler Headquarters, SHAC, mural, Community