Sandbags placed along the river bank to prevent flooding onto the road. The earthquake caused the ground in this area to subside , making it susceptible to flooding.
Severe damage on a New Brighton Road. It had to be reformed and raised up 40 cm. A pile of dried liquefaction has been shovelled onto the footpath. Road cones mark out the uneven surfaces on the road.
A dock by the riverbank walkway alongside New Brighton Road which has been closed off to the public. The area has flooded at high tide due to ground subsidence".