Search results
Islandora sort
Showing 1 - 20 of 41 results.
- dc.title
- Risk Management Plan
- dc.description
- A plan which defines the risk and opportunity management activities to be applied by SCIRT to meet SCIRT objectives. The first version of this plan was produced on 12 September 2011.
- Creator(s)
- Peter Dooley, Ian Campbell, Jason Smith, Rod Cameron
- Date
- 1:00pm 8th November 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Crack'd for Christchurch Plan 03
- dc.description
- A digital copy of a plan for Crack'd for Christchurch's armchair artwork. The plan shows three views of an armchair from different angles.
- Creator(s)
- Jenny Cooper
- Tags
- Crackd for Christchurch, armchair, artwork, plan, sketch, Arts, Culture and Society
- dc.title
- Close Down Activities Management Plan
- dc.description
- A plan which documents how SCIRT is to efficiently and effectively ramp down the delivery of its work, demobilise facilities and resources and wind up the organisation.
- Creator(s)
- Ian Campbell
- Date
- 12:00pm 15th June 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Scope Management Plan
- dc.description
- A plan which outlines the principles and methodology for the development of projects. The first version of this plan was produced on 20 September 2011.
- Creator(s)
- Richard Topham, Paula Lock
- Date
- 1:00pm 25th November 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Quality Management Plan
- dc.description
- A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.
- Creator(s)
- Johan Rivas, Greg Slaughter, R Milsom, R Topham, Maxie Christison, Anita Collie
- Date
- 1:00pm 16th December 2015
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Crack'd for Christchurch Plan 01
- dc.description
- A digital copy of a concept drawing of Crack'd for Christchurch's armchair and ottoman artworks. The drawing is of an armchair and an ottoman. A written note near the bottom of the drawing reads, "Cast iron legs sources from Victorian bath tubs".
- Creator(s)
- Jenny Cooper
- Tags
- Crackd for Christchurch, armchair, chair, ottoman, design, sketch, artwork, Flora, Otto, plan, Arts, Culture and Society
- dc.title
- Crack'd for Christchurch Plan 04
- dc.description
- A technical drawing of Crack'd for Christchurch's armchair artwork. The drawing includes height and width measurements for the back of the chair.
- Creator(s)
- Jonathan Hall
- Tags
- Crackd for Christchurch, technical drawing, armchair, artwork, plan, Arts, Culture and Society
- dc.title
- Peak Performance Plan
- dc.description
- A plan which provides SCIRT with a map for building and sustaining outstanding performance. The first version of this plan was produced on 18 February 2013.
- Creator(s)
- Belinda de Zwart, Mason Tolerton
- Date
- 1:00pm 21st November 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Asset Investigation Management Plan
- dc.description
- A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
- Creator(s)
- J Moore, A Hughes, R Topham, D Heiler, Paula Lock
- Date
- 1:00pm 1st February 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Procurement Management Plan
- dc.description
- A plan which defines the procurement activities to be applied to SCIRT and explains how those activities are to be undertaken to meet SCIRT objectives and requirements. The first version of this plan was produced on 14 September 2011.
- Creator(s)
- Mark Rodhouse, Ian Campbell, Jason Smith
- Date
- 1:00pm 22nd January 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Crisis Management Plan
- dc.description
-
A plan which provides SCIRT with clear direction and guidelines regarding communication in the event of a crisis. The first version of this plan was produced on 1 December 2013.
Note that personal details of key personnel have been removed from this document.
- Creator(s)
- Annemarie Mora, Linda McGregor
- Date
- 1:00pm 1st March 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Design Management Plan
- dc.description
- A plan which describes how SCIRT will carry out design work. The first version of this plan was produced on 1 September 2011.
- Creator(s)
- T Anderson, M Rodhouse, A Zalucki, R Milsom, S Wright, Paula Lock
- Date
- 1:00pm 1st February 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Project Prioritisation Management Plan
- dc.description
- A plan which describes the framework, principles and process for determining project prioritisation and the sequence in which those projects are carried out. The first version of this plan was produced on 23 September 2011.
- Creator(s)
- Karin Lehmann, Mark Rodhouse, Matt Thomas, Ian Campbell, Richard Topham
- Date
- 1:00pm 14th February 2013
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- IRMO to SCIRT Transition Management Plan
- dc.description
- A plan which describes how the transition from the IRMO programme to the SCIRT programme will take place after the signing of the Alliance Agreement.
- Creator(s)
- Mark Rodhouse, Duncan Gibb
- Date
- 12:00pm 20th September 2011
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- KRA Management Plan
- dc.description
- A plan which defines the framework for performance measurement to align SCIRT with the objectives from the Alliance Agreement objectives. The first version of this plan was produced on 20 August 2011.
- Creator(s)
- Mark Rodhouse, R Milsom, Richard Topham, Duncan Gibb, Rod Cameron
- Date
- 1:00pm 16th February 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Gap Filler Project 22: Furnishing Layouts
- dc.description
- A plan depicting the possible furnishing layouts of Gap Filler Project 22, the Pallet Pavilion.
- Tags
- Gap Filler, Pallet Pavilion, plan, Community
- dc.title
- Emergency Response Plan
- dc.description
-
A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012.
Note that personal details of key personnel have been removed from this document.
- Creator(s)
- Tony Gallagher, Maree Pycroft, Suzanne Fenwick
- Date
- 1:00pm 31st October 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Health and Safety Management Plan
- dc.description
- A plan which aims to ensure an environment of Zero Harm on SCIRT worksites. The first version of this plan was produced on 29 July 2011.
- Creator(s)
- Ian Campbell, Johan Rivas, Greg Slaughter, Richard Milsom, Many Bertie, David Hanham
- Date
- 12:00pm 12th August 2016
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- Horizontal Infrastructure Rebuild Strategy Management Plan
- dc.description
- A plan which defines the strategy underlying the SCIRT rebuild programme.
- Creator(s)
- Rod Cameron
- Date
- 12:00pm 20th September 2011
- Tags
- management plan, plan, founding document, strategy, intention
- dc.title
- A Design for a New Christchurch Cathedral
- dc.description
- A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".
- Creator(s)
- Steven Taylor
- Date
- 12:44am 24th June 2012
- Tags
- rebuild, Cathedral Square, plan, cathedral